The plot check starts with access. If the home cannot be delivered easily, the project needs a delivery plan before pricing can be trusted.

The second check is the foundation. Soil report, slope, drainage, frost depth, and finished floor height all change the allowance.

The last check is services. Water, electricity, drainage, and internet routes should be mapped before the buyer locks the model.